Following the Start of Winter, Jinan kicked off its heating season. Relying on the "Liaocheng Heat to Jinan" cross-regional long-distance heat transmission project, the main urban area has achieved coal-free central heating. During the previous heating season, the project delivered over 15 million gigajoules of heat, covering a heating area of more than 93 million square meters. For the current heating season, its external heat supply capacity exceeds 100 million square meters.
With a main pipeline spanning nearly 150 kilometers, the project transports surplus industrial waste heat from Liaocheng Thermal Power Plant to Jinan, turning waste heat into a heat source. During the heating season, it can reduce standard coal consumption by about 1.3 million metric tons and cut carbon dioxide emissions by approximately 3.56 million metric tons.
Empowered by sci-tech innovations in heating support, relay energy stations rely on heat-boosting units and inspection robots to safeguard pipeline network operations. The smart heating platform connects to multiple heat sources and applies digital twin models to predict heat loads 72 hours in advance, overcoming the nearly 10-hour transmission lag of long-distance transport, with multiple heat sources serving as mutual backups to ensure a stable heat supply. This project provides a replicable model for collaboration across the Jinan Metropolitan Area and the green transformation of the Yellow River Basin.