Mobile
browsing
New energy & materials
Yantai
Cooperation, Joint Venture or Sole Investment, Domestic Investment and Foreign Investment
The project is located in Jincheng Lindian Industrial Park, next to Huadian Power International Laizhou Power Plant. Million tons of fly ash, furnace bottom slag and desulfurized gypsum generated by the power plant can be totally digested as production raw materials such as cement, gypsum board, etc, which not only saves the cost of coal slag storage and handling in the power plant, but also reduces the cost of building materials production enterprises to transport coal slag and fly ash to other places. The project strengthens the relationship between industries, realizes the multi-level transformation and value-added of coal resources, improves the comprehensive benefits, and realizes the comprehensive utilization and recovery of waste residue.
The project is located in Jincheng Lindian Industrial Park. The first phase of the project has been put into operation in 2012. The second phase will be put into operation in 2019, with an annual output of more than 1 million tons of fly ash, furnace bottom slag and desulfurization gypsum. This project uses these as raw material to produce cement, gypsum board and other construction materials.
The project is a circular economy and state-supported project with great economic benefits.
Zhang Shujun and Jiang Xiaodong 0535-2636138 13505353467 13505353240